I would like to Make a Capital Campaign Pledge
As of February 23, 2026, we have received $3,902,761.32 in pledges.
List of Completed Projects
- Emergency Stained Glass Window Repairs

- Organ Repairs

- Installed the Elevator Circuit Boards Replacements
- New Golf Cart

- Termite Treatment

- Pressure Washed, Repaired, and Painted the exterior


- Installed Hurricane Protection on the Stained Glass Windows

- Installed Hurricane Windows on the east and west sides of the Sanctuary and the church office.

- Installed the necessary elevator door lock
- Installed 40 replacement light fixtures for the Courtyard and the east side of Fellowship Hall.

- Installed four new Gospel stained glass windows (Matthew, Mark, Luke, and John) in the lobby.
- Repaired the east wall in the Sanctuary

List of In Process Projects
The Sanctuary and Education Building Air Conditioning System has been ordered. The next step is permitting.
Signed the contract to make necessary roof repairs (some roofs already addressed)
Signed the contract to paint the interior of the Sanctuary & Covered Patio
